In development
Landen-Gingelom
Projectoverzicht
ENGIE ontwikkelt een project van drie windturbines. Het windturbineproject situeert zich ten noorden (2) en ten zuiden (1) van en parallel aan de autosnelweg E40 in Landen en Gingelom.
Kerncijfers
Number of turbines
Power per turbine
Equivalent consumption
CO₂e savings
Veelgestelde vragen
Are wind turbine blades buried at the end of their lifespan?
Is a residential wind turbine cost-effective and affordable?
Is wind energy too expensive and does it drive up electricity bills?
Are wind turbines one of the main causes of bird mortality?
Do wind turbines make as much noise as a vacuum cleaner?
Are wind turbines an ecological disaster when it comes to recycling them at the end of their lifespan?
Do wind turbines emit more CO₂ than they save?
Do wind turbines cause environmental damage?
Do wind turbines damage the landscape?
Do wind turbines consume more energy than they produce?
Updates
Openbaar onderzoek gaat van start op 7 maart 2026
De omgevingsvergunningsaanvraag is volledig en ontvankelijk verklaard. Het openbaar onderzoek voor dit windturbineproject gaat van start op 7 maart 2026 en loopt tot en met 5 april 2026. Tijdens deze periode, die 30 dagen duurt, hebben omwonenden de kans om zich uit te spreken over dit project. Het hele dossier is raadpleegbaar via het Omgevingsloket of op het stadhuis van Landen en het gemeentehuis van Gingelom.
Informatievergadering – webinar
In het kader van de MER-procedure wordt tijdens het openbaar onderzoek op donderdagavond 12 maart 2026 om 20u een online informatiemoment (webinar) georganiseerd. Tijdens dit webinar zal toelichting gegeven worden over het project en de MER-procedure. Het webinar is online te volgen via onderstaande link.
Informatievergadering windturbineproject Landen-Gingelom | Meeting-Join | Microsoft Teams
Information session on 10 February 2026
On Tuesday 10 February 2026, ENGIE will organise an information session about the project in the Hoeve Goyens Hall (Raatshovenstraat 87, 3400 Landen). You are welcome to drop by with any questions between 6:00 p.m. and 8:00 p.m. Residents living near the project (within a radius of approximately 2.5 km) will receive an invitation in their mailbox in the coming days.
Project status
In March 2021, the project was withdrawn. ENGIE is currently carrying out the necessary studies to submit a new permit application.
Elisabeth Deketelaere
Neem dan contact met ons op via onderstaand e-mailadres.
Discover all our production sites
Downloads
Articles and press releases
Borealis Transforms Company Parking Lots into Solar Farms in Collaboration with ENGIE
Sabic inaugurates world's largest circular solar installation of its kind in Genk
ENGIE is part of a strategic consortium to pursue the offshore wind Princess Elisabeth concessions in Belgium