In operation

Greensky E40 – Gingelom

Windpark langsheen de E40 en HST-lijn Brussel Luik.

Projectoverzicht

Er waait een frisse wind bij de spoorwegen. Het project strekt zich over 6 gemeenten, 4 provincies en 2 gewesten. Het windpark werd gerealiseerd en wordt uitgebaat en onderhouden door Greensky cvba, een partnership tussen Electrabel, Infrabel, Sint-Truiden en de Brusselse Elektriciteitsintercommunale (IBE).

Kerncijfers

7 Turbines
Number of turbines
2 MW
Power per turbine
10286 Families
Equivalent consumption
42797 CO₂e
CO₂e savings

Veelgestelde vragen

Are wind turbine blades buried at the end of their lifespan?

Many people think that wind turbine blades are eventually buried. Spoiler alert: that’s not the case at all!

Is a residential wind turbine cost-effective and affordable?

Installing a small wind turbine in your garden may seem attractive, but in practice it is rarely cost-effective.

Is wind energy too expensive and does it drive up electricity bills?

In reality, wind energy is more affordable for your wallet than you might think.

Are wind turbines one of the main causes of bird mortality?

There is a lot of discussion about wind turbines and their impact on birds, but did you know that it is very rare for a bird to be killed by a collision with a wind turbine?

Do wind turbines make as much noise as a vacuum cleaner?

“Do wind turbines make far too much noise?” Not really.

Are wind turbines an ecological disaster when it comes to recycling them at the end of their lifespan?

The vast majority of a wind turbine can be recycled: steel, electronic components, concrete from the foundations, and so on.

Do wind turbines emit more CO₂ than they save?

This question may arise when we look at the full life cycle of a wind turbine.

Do wind turbines cause environmental damage?

Every human activity has an impact on the environment, and wind farm projects are no exception.

Do wind turbines damage the landscape?

This is first and foremost a highly subjective issue that varies from person to person.

Do wind turbines consume more energy than they produce?

This is a misconception.

Elisabeth Deketelaere

Projectleider
Vragen?
Neem dan contact met ons op via onderstaand e-mailadres.

Discover all our production sites

Articles and press releases

Card image cap
Press

Borealis Transforms Company Parking Lots into Solar Farms in Collaboration with ENGIE

Vienna, Austria / Beringen and Kallo, Belgium – Starting this month, Borealis deploys solar canopies with a total capacity of 3.3 MWp on the parking lots of its Belgian manufacturing sites in Kallo and Beringen. Equipped with nearly 4,800 bifacial solar panels, the canopies are expected to generate 3,250 MWh of renewable energy per year, saving 550 tons of CO2 emissions per year. The solar canopies were installed by ENGIE Sun4Business, the subsidiary of energy utility ENGIE that offers solar power as a service to businesses in Belgium and the Netherlands.
18/09/2025
Card image cap
Press

Sabic inaugurates world's largest circular solar installation of its kind in Genk

17/10/2024
Card image cap
Article

ENGIE is part of a strategic consortium to pursue the offshore wind Princess Elisabeth concessions in Belgium

Three prominent energy companies, Eneco, Otary and Ocean Winds (the joint venture between EDP Renewables and ENGIE dedicated to offshore wind energy), announced the formation of a strategic partnership to jointly compete in the tender for the offshore wind Princess Elisabeth concessions in Belgium.
12/07/2024
Card image cap
Press

Google and ENGIE strengthen their partnership through Power Purchase Agreements in Belgium

Google and ENGIE have just signed a series of new Corporate Power Purchase Agreements (cPPAs) for which ENGIE will provide more than 118 MW of renewable power to Google’s digital infrastructure portfolio in Belgium.
02/07/2024