Landen-Gingelom

ENGIE Electrabel is developing three wind turbines along the E40 motorway: two in Landen and one in Gingelom.

ENGIE Electrabel is developing a project of three windturbines. The wind farm will be located north (2 turbines) and south (1 turbine) of, and parallel to, the E40 motorway in the municipalities of Landen and Gingelom.

Key figures:

Number of turbines3
Power per turbine4,8 MW
Equivalent consumption8000 households
CO2e-reduction11,200 tonnes

Planning:

January 2026Permit application
10/02/2026Information session
July 2026Government decision

 

Updates

Information session on 10 February 2026

27/01/2026

On Tuesday 10 February 2026, ENGIE will organise an information session about the project in the Hoeve Goyens Hall (Raatshovenstraat 87, 3400 Landen). You are welcome to drop by with any questions between 6:00 p.m. and 8:00 p.m. Residents living near the project (within a radius of approximately 2.5 km) will receive an invitation in their mailbox in the coming days.

Project status

01/03/2021

In March 2021, the project was withdrawn. ENGIE is currently carrying out the necessary studies to submit a new permit application.