In development

Temse Mercator

Header CTA

Projectoverzicht

ENGIE ontwikkelt een project van twee windturbines. Het windturbineproject situeert zich op de grens van Temse en Beveren-Kruibeke-Zwijndrecht ter hoogte van Lauwershoek en is omgeven door hoogspanningslijnen en de hoogspanningspost Mercator. 

In parallel ontwikkelt Luminus in dezelfde projectzone het windturbineproject Beveren Mercator dat ook uit twee windturbines bestaat (meer info: www.windBeverenMercator.be).

Kerncijfers

2 Turbines
Number of turbines
6 MW
Power per turbine
6200 Families
Equivalent consumption
8700 Tonnes
CO₂e savings

Veelgestelde vragen

Are wind turbine blades buried at the end of their lifespan?

Many people think that wind turbine blades are eventually buried. Spoiler alert: that’s not the case at all!

Is a residential wind turbine cost-effective and affordable?

Installing a small wind turbine in your garden may seem attractive, but in practice it is rarely cost-effective.

Is wind energy too expensive and does it drive up electricity bills?

In reality, wind energy is more affordable for your wallet than you might think.

Are wind turbines one of the main causes of bird mortality?

There is a lot of discussion about wind turbines and their impact on birds, but did you know that it is very rare for a bird to be killed by a collision with a wind turbine?

Do wind turbines make as much noise as a vacuum cleaner?

“Do wind turbines make far too much noise?” Not really.

Are wind turbines an ecological disaster when it comes to recycling them at the end of their lifespan?

The vast majority of a wind turbine can be recycled: steel, electronic components, concrete from the foundations, and so on.

Do wind turbines emit more CO₂ than they save?

This question may arise when we look at the full life cycle of a wind turbine.

Do wind turbines cause environmental damage?

Every human activity has an impact on the environment, and wind farm projects are no exception.

Do wind turbines damage the landscape?

This is first and foremost a highly subjective issue that varies from person to person.

Do wind turbines consume more energy than they produce?

This is a misconception.

Updates

Vergunningsaanvraag ingediend

12/03/2026

De vergunningsaanvraag is ingediend. Wanneer de administratie het dossier volledig verklaart, start de vergunningsprocedure. Van zodra de startdatum van het openbaar onderzoek gekend is, publiceren we dat op deze website.  

Infosessie op 17 december 2024

22/11/2024

ENGIE en Luminus organiseren op 17 december een infosessie rond het project. Inschrijven kan via volgende link: https://windbeverenmercator.be/

Elisabeth Deketelaere

Projectleider
Vragen?
Neem dan contact met ons op via onderstaand e-mailadres.