In development

Fexhe-Slins Est

Un projet de 5 éoliennes le long de l’autoroute E313 à l’est de Fexhe-Slins.

Aperçu du projet

Un projet de 5 éoliennes le long de l’autoroute E313 à l’est de Fexhe-Slins.

Chiffres clés

5 Turbines
Number of turbines
Max 5 MW
Power per turbine
15000 Families
Equivalent consumption
80244,40 Tonnes
CO₂e savings

Questions fréquentes

Are wind turbine blades buried at the end of their lifespan?

Many people think that wind turbine blades are eventually buried. Spoiler alert: that’s not the case at all!

Is a residential wind turbine cost-effective and affordable?

Installing a small wind turbine in your garden may seem attractive, but in practice it is rarely cost-effective.

Is wind energy too expensive and does it drive up electricity bills?

In reality, wind energy is more affordable for your wallet than you might think.

Are wind turbines one of the main causes of bird mortality?

There is a lot of discussion about wind turbines and their impact on birds, but did you know that it is very rare for a bird to be killed by a collision with a wind turbine?

Do wind turbines make as much noise as a vacuum cleaner?

“Do wind turbines make far too much noise?” Not really.

Are wind turbines an ecological disaster when it comes to recycling them at the end of their lifespan?

The vast majority of a wind turbine can be recycled: steel, electronic components, concrete from the foundations, and so on.

Do wind turbines emit more CO₂ than they save?

This question may arise when we look at the full life cycle of a wind turbine.

Do wind turbines cause environmental damage?

Every human activity has an impact on the environment, and wind farm projects are no exception.

Do wind turbines damage the landscape?

This is first and foremost a highly subjective issue that varies from person to person.

Do wind turbines consume more energy than they produce?

This is a misconception.

Updates

Enquête publique jusqu'au 22/05/2023

19/04/2023

L’enquête publique est ouverte dans les communes de Oupeye, Juprelle, Bassenge, Herstal, Liège et Visé.

Signature d’une convention

30/01/2023

Signature d’une convention avec la commune de Oupeye pour acter la prise de participation de la commune dans une éolienne du projet.

2ème réunion d'information préalable

21/12/2021
Découvrez ci-dessous les documents présentés lors de la réunion d’information préalable (+ retransmission vidéo de la réunion).
Notez que le délai pour faire part des observations, suggestions ou remarques est prolongé jusqu’au 14 janvier inclus.
Read more (pdf)

1ère réunion d'information préalable

27/06/2019
Découvrez ci-dessous les documents présentés lors de la réunion d’information préalable.
Card image cap

Amadéo Dumont

Projectleider
Vragen?
Neem dan contact met ons op via onderstaand e-mailadres.

Discover all our production sites